嫩BBB搡BBB搡BBB四川_CHINESE国产人妖TS_少妇久久久久久被弄到高潮_亚洲色大成网站WWW永久网站_爱做久久久久久_深夜放纵内射少妇_欧美牲交a欧美牲交aⅴ图片_国精产品一二二线_国产亚洲人成网站在线观看琪琪秋_

Service hotline:

0315-5913666

+86-18931500255

Domestic > Nanshan Coal Preparation Plant of Hegang Mining Bureau
鶴崗礦務(wù)局南山選煤廠.jpg
  • 鶴崗礦務(wù)局南山選煤廠.jpg

Nanshan Coal Preparation Plant of Hegang Mining Bureau

Type: Coking coal preparation plant

Scale: 3.60Mt/a

Contracting mode: partial contracting and renovation projects

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, the fine coal slurry is sorted by a flotation machine, the flotation clean coal is dehydrated and recovered by a pressure filter, and the tail coal slurry water is concentrated by a thickener and then dehydrated and recovered by a pressure filter. The washing water is closed loop, environmentally friendly and energy-saving.